Search Results for: M Project
Supertest: 🇺🇸 M47 M Project (More Complete Stats)
M47 M Project. Statistics with crew at 100%: Tier: MT-8, USA, premium HP: 1 300 Engine: 800 hp Mass: 47,18 t Maximum load: 50,0 t Power-to-weight: 16,95 hp / t Max speed / Reverse speed: 40 / –15 km / h Hull turning speed: 33,38 °/s Turret turning speed: 31,29 °/s Terrain resistance values: — … Continue reading Supertest: 🇺🇸 M47 M Project (More Complete Stats)
WoT Supertest: M Project
The M Project, a Tier VIII American medium tank, is coming to the Supertest. This vehicle features armouring reinforced with screens attached to the hull and turret.
Project CW: Game Modes Update – What’s Coming Next
As promised, our response to your awesome feedback — today we’ll speak about Game Modes, their updates, and even exploring some new ones. Here’s what’s coming up:
18th Supertest of Project CW – Version 0.0.218.5036
In this version of Lodestar, we are focusing on changes and updates to game modes that were previously tested in Lodestar #16. 1. Changes to Game Modes Kill Confirmed: • The arena size has been increased. Based on your feedback, arena locations will no longer repeat during a match.• The number of tags required for … Continue reading 18th Supertest of Project CW – Version 0.0.218.5036
Project CW: 16th Supertest Version – New Game Modes
This is the first Lodestar (supertest) after Alpha Test 2. 📚Patch Notes 1. Mode: Tug of War• Two teams compete for control over a series of capture points (5 in total), arranged in a straight line between each team’s spawn zones.• The farther a capture point is towards the enemy side, the more points it … Continue reading Project CW: 16th Supertest Version – New Game Modes
Project CW: Lodestar Program (Closed Supertest) Returns in 2025
This playtest will focus on an experimental game mode inspired by fast-paced combat and the Kill Confirm mechanic, as well as the addition of three new game modes. A full patch note will be released later. • The test, exclusive to program participants, will run from April 17 at 18:00 to April 21 at 09:00 … Continue reading Project CW: Lodestar Program (Closed Supertest) Returns in 2025