🇬🇧Triumphant (Tier X medium tank, promotional)
General:
• Tank classification changed: Premium → Promotional
• Tank tag removed: “Unique”
This was expected.
🇩🇪Leopard 120 Verbessert (Tier XI medium tank, techtree, mechanic: Analog ballistic computer)
Firepower:
• Shell velocity (HEAT): Increased from 1,000 to 1,360
🇨🇳PTZ-78 (Tier XI tank destroyer, techtree, mechanic: Sequential rocket boosters)
Firepower:
• Projectile cost (AP): Reduced from 2,078 to 1,999 credits
• Projectile cost (HEAT): Increased from 7,200 to 7,600 credits
🇺🇸Ares 75 (Tier VIII medium tank, techtree, mechanics: Automatic gun with a temperature control system, Reserve track)
Turret 1/1 — Ares 75
Gun 1/2 — 75 mm Ares MC-AAAC:
• Projectile cost (AP): Increased from 86 to 94 credits
• Projectile cost (HE): Increased from 65 to 188 credits
Gun 2/2 — 75 mm Ares ADMAG:
• Projectile cost (AP): Increased from 92 to 99 credits
• Projectile cost (HE): Increased from 69 to 198 credits
🇺🇸Ares 85 (Tier IX medium tank, techtree, mechanics: Automatic gun with a temperature control system, Reserve track)
Turret 1/1 — Ares 85
Gun 1/2 — 75 mm Ares “Super”:
• Projectile cost (AP): Increased from 100 to 108 credits
• Projectile cost (HE): Increased from 75 to 216 credits
Gun 2/2 — 85 mm Ares MC-AAAC:
• Projectile cost (AP): Increased from 140 to 155 credits
• Projectile cost (HE): Increased from 105 to 310 credits
🇺🇸Ares MTB (Tier IX medium tank, premium, mechanics: Automatic gun with a temperature control system, Reserve track)
Firepower:
• Projectile cost (AP): Increased from 144 to 159 credits
• Projectile cost (HE): Increased from 108 to 318 credits
🇺🇸Ares 90 (Tier X medium tank, techtree, mechanics: Automatic gun with a temperature control system, Reserve track)
Firepower:
• Projectile cost (AP): Increased from 230 to 253 credits
• Projectile cost (HE): Increased from 173 to 506 credits
🇺🇸Ares 90 C (Tier XI medium tank, techtree, mechanics: Automatic gun with a temperature control system, Reserve track)
Firepower:
• Projectile cost (AP): Increased from 274 to 299 credits
• Projectile cost (APCR): Reduced from 2,000 to 1,800 credits
• Projectile cost (HE): Increased from 206 to 598 credits
