http://rykoszet.info/wp-content/uploads/2019/10/opening.jpg
Source: EU Forums
What is going to change?
-The courts behind the “ПОДВИГ НАРОДА БЕССМЕРТЕН” (“The People’s Deeds Are Immortal” ) buildings have been opened.
-The map setting has been changed to fall — the foliage has been removed from the trees. Some shrubbery has been added in the park.
-The riverbed has been drained and turned into a playable zone. Several exits from the riverbed have been added in various parts of the map.
-The white fence along the central avenue has been removed and substituted with hills.
-Some covers have been added along the street on line 9.
-The map size has been slightly increased, and a passage has been added behind the buildings along line K.
-The encounter area at the “small town” has been completely redesigned—a subway construction site has been added.
-The red border line has been shifted—the remote passage along line 1 has been removed.
-Additional covers along the upper part of the street on line 2 have been added.
-The alternative variant differs by an additional passage in the “small town”.
The decision as to whether the changes made to the Minsk map will be preserved depends on the test results.
http://rykoszet.info/wp-content/uploads/2019/10/1-1.jpg
http://rykoszet.info/wp-content/uploads/2019/10/2-1.jpg
http://rykoszet.info/wp-content/uploads/2019/10/3-1.jpg
http://rykoszet.info/wp-content/uploads/2019/10/4-1.jpg
http://rykoszet.info/wp-content/uploads/2019/10/5.1.jpg
http://rykoszet.info/wp-content/uploads/2019/10/5.2.jpg
http://rykoszet.info/wp-content/uploads/2019/10/6.jpg
http://rykoszet.info/wp-content/uploads/2019/10/7.jpg
http://rykoszet.info/wp-content/uploads/2019/10/8.jpg
http://rykoszet.info/wp-content/uploads/2019/10/9.jpg
http://rykoszet.info/wp-content/uploads/2019/10/10.jpg